This document could not be shown here. Open the PDF.
Text of this document6 pages · 1,382 words
Page 1
Energi Savr Node QSE-CI-AP-D Programming Interface 369282e 1 11.08.23 Energi Savr Node Programming Interface The QSE-CI-AP-D is a programming interface designed to be used with Energi Savr Node units. It is compatible with the entire Energi Savr Node product family (models starting with QSN- and QSNE-), and works with an intuitive application for Apple iPhone, iPad or iPod touch mobile devices. Features • Program all Energi Savr Node modules connected to the same QS link as the Energi Savr Node programming interface using the Energi Savr Node app on Apple iPhone, iPad or iPod touch mobile devices. • A system is defined as all devices connected on a single QS link. For installations with multiple QS links, one Energi Savr Node Programming Interface is required for every QS link. • Powered by the QS link, line voltage not required. • Install using one of the three following methods: 1. DIN rail Unit shown at actual size 2. Surface mount 3. Junction box Requirements • The Energi Savr Node Programming Interface is powered by the QS link, and consumes 2 power draw units. For complete information, see "Power Draw Units on the QS Link" Lutron P/N 369405 at www.lutron.com System Example Energi Savr Energi Savr Energi Savr QSM QSM QSM Node Unit Node Unit Node Unit QS Link Dedicated Ethernet Connection QS Link for Energi Savr Node Units Wireless Router Energi (by others) Savr Node Apple iPod touch, Programming iPad or iPhone Interface mobile device 1 ® SPECIFICATION SUBMITTAL Page Job Name: Model Numbers: Job Number:
Page 2
Energi Savr Node QSE-CI-AP-D Programming Interface 369282e 2 11.08.23 Specifications Ethernet Connection Power • Standard CAT5 (or better) cable connects the • SELV / PELV / NECR Class 2 QSE-CI-AP-D interface to a wireless router. • Operating voltage: 24–36 V- 40 mA • Supports MDI / MDIX auto-crossover (no crossover • Consumes two (2) power draw units on the QS link. cable needed). Refer to the QS Link Power Draw Units specification • Total cable length must be 327 ft (100 m) or less. submittal (Lutron P/N 369405) for more information • Ethernet network and cable provided by others. concerning Power Draw Units. QS Link Limits Standards • Each Energi Savr Node Programming Interface counts • CE Certified as 1 device towards the 100 device QS link limit. • Lutron Quality Systems registered to ISO 9001.2000 • QS communication link uses SELV / PELV / NECR • NOM Compliant Class 2 wiring. Follow all local and national electrical Environment codes when installing SELV / PELV / NECR Class 2 • Ambient Temperature Operating Range: 32 ºF to 140 ºF wiring with line voltage wiring. (0 ºC to 60 ºC) • The total length of the QS link must not exceed • Relative humidity: less than 90% non-condensing 2000 ft (610 m). See table below. • For indoor use only Table 1: QS Link Wiring Options Terminals QS Link Wiring Wire Gauge Lutron® Cable Part Number • Ethernet port Length 2 2 • QS Link Wiring: 22 AWG to 12 AWG (0.5 mm to 4.0 mm ) Less than 500 ft Power (terminals 1 and 2) GRX-CBL-346S (non-plenum) 2 Mounting (153 m) 1 pair 18 AWG (1.0 mm ) GRX-PCBL-346S (plenum) • DIN rail - occupies three DIN rail mount spaces at Data (terminals 3 and 4) 1 twisted, shielded pair 2 2.125 in (53 mm) wide 22 AWG (0.5 mm ) • Surface mount Up to 2000 ft Power (terminals 1 and 2) GRX-CBL-46L (non-plenum) 2 • Junction box (610 m) 1 pair 12 AWG (4.0 mm ) GRX-PCBL-46L (plenum) Programming Requirements Data (terminals 3 and 4) 1 twisted, shielded pair • An Apple iPod touch, iPad or iPhone mobile device with 22 AWG (0.5 mm2) the Energi Savr Node app is required for programming Energi Savr Node units. QS Link Terminal Connections • The Energi Savr Node app for Apple iPod touch, iPad • Each QS link terminal can accept only two 18 AWG or iPhone is used to program the Energi Savr Node 2 2 unit in installations requiring an Energi Savr Node (1.0 mm ) wires. Two 12 AWG (4.0 mm ) conductors programming interface for commissioning. The Energi will not fit. Connect as shown below using appropriate Savr Node app is available on the Apple App Store or wire connectors. from the iTunes Store online marketplace. • The Energi Savr Node app cannot be used to program 12 AWG 2 the Energi Savr Node units when installed as part of a (4.0 mm ) Quantum or Athena system. • The Apple iPod touch, iPad or iPhone communicates with the Energi Savr Node unit via a WiFi router (not 18 AWG 2 included). (1.0 mm ) • See “Programming Options” section for further information. 2 ® SPECIFICATION SUBMITTAL Page Job Name: Model Numbers: Job Number:
Page 3
Energi Savr Node QSE-CI-AP-D Programming Interface 369282e 3 11.08.23 Powering the QSE-CI-AP-D • The QSE-CI-AP-D consumes 2 power draw units on the QS link and counts as one device toward the 100 device QS link limit. • The QSE-CI-AP-D may also be powered by a QS Link power supply (QSPS-P1-1-50, QSPS-P2-1-50, or QSPS-P3-1-50) or a QS shade panel power supply (QSPS-P2-10-60 for 230 V~, or QSPS-P1-10-60 for 120 V~). Wiring Example: Using a QS Link Power Supply ESN = Energi Savr Node Unit 120-277 V~ UL Products 230 V~ CE Products ESN 1 ESN 1 ESN ESN Programming Programming Interface The ESN Interface Programming Interface is powered by ESN 1 only. Terminal 2 ESN 2 terminates at the ESN Programming Interface. ESN 2 3 ® SPECIFICATION SUBMITTAL Page Job Name: Model Numbers: Job Number:
Page 4
Energi Savr Node QSE-CI-AP-D Programming Interface 369282e 4 11.08.23 Mechanical Dimensions (using DIN rail only) 2.1 in (53 mm) 3.5 in (88 mm) 2.1 in (53 mm) 2.4 in (60 mm) ® SPECIFICATION SUBMITTAL Page 4 Job Name: Model Numbers: Job Number:
Page 5
Energi Savr Node QSE-CI-AP-D Programming Interface 369282e 5 11.08.23 Mechanical Dimensions (using metal enclosure LUT-8X8-ENC) 0.06 in (1.52 mm) 8.00 in 4.06 in (203 mm) (103 mm) 8.00 in (203 mm) ® SPECIFICATION SUBMITTAL Page 5 Job Name: Model Numbers: Job Number:
Page 6
Energi Savr Node QSE-CI-AP-D Programming Interface 369282e 6 11.08.23
Programming with Apple iPod touch, iPad or iPhone • Use the intuitive programming application for the Apple iPod touch, iPad or iPhone to program systems with multiple Energi Savr Node units and QS Sensor Modules (QSMs) on the QS link. • See the Energi Savr Node Handheld Programming Guide (P/N 040384) at www.lutron.com for more information on programming your Energi Savr Node system. Energi Savr Energi Savr Energi Savr QSM QSM QSM Node Unit Node Unit Node Unit QS Link Dedicated Ethernet Connection QS Link for Energi Savr Node Units NOTE: Energi Savr Node Programming Interface units are Wireless Router Energi not designed to exist on an open network. Connection to (by others) Savr Node an open network could result in reduced performance and Apple iPod touch, Programming Ethernet connectivity issues. iPad or iPhone Interface mobile device Features unlocked by programming application and interface • Sensors and controls can be shared between Energi Savr Node units on the QS link (SELV / PELV / NECR Class 2 Dry Contact Switch inputs cannot be shared between Energi Savr Node units on the QS link) • Associate multiple QSMs to one or more Energi Savr Node units on QS link Associate up to 100 of each type of input to multiple Energi Savr Node units connected to a single QS link. • Inputs can be connected to Energi Savr Node units or QSMs Link input limits: • 100 wired or wireless occupancy sensors on the QS link • 100 wired or wireless daylight sensors on the QS link • 100 wired wallstations or Pico wireless controllers on the QS link • 16 wired or wireless daylight sensors on an EcoSystem link The Lutron logo, Lutron, Energi Savr Node, Pico, Athena, EcoSystem and Quantum are trademarks or registered trademarks of Lutron Electronics Co., Inc. in the US and/or other countries. Apple, iPhone, iTunes, App Store, iPad and iPod touch are trademarks of Apple Inc., registered in the U.S. and other countries. All other product names, logos, and brands are property of their respective owners. 6 ® SPECIFICATION SUBMITTAL Page Job Name: Model Numbers: Job Number:
Need assistance or looking to source this item?