Future Automation OSL88 technical sheet

Page 1 of 4100%
Text of this document4 pages · 789 words

Page 1

OSL 88 OUTDOOR SPEAKER LIFT |MECHANISM AS SUPPLIED| |SPEAKER NOT INCLUDED| TECHNICAL SHEET UK +44 (0) 1438 833577 US +1 (603) 742 9181 ISSUE 002 WWW NET . . SHEET 1 FUTUREAUTOMATION

Page 2

OSL 88 The mechanism Primary Frame will provide a watertight housing when in OUTDOOR SPEAKER LIFT 18.31 the fully closed and fully open positions. 465 B SECTION C-C Floor pit can be back-filled with soil GENERAL DIMENSIONS after installation if desired. The maximum weight of the flap panel = 2kg [4.4lbs]. 24.00 The flap panel should be constructed from the same thickness Flap Panel will drop and roll over material as the static, surrounding floor. 609.6 18.44 to the front of the mechanism 468.5 Floor Pit before the speaker is raised. The The flap panel can be cut to the same profile as the speaker if Diameter speaker lifting beam will also desired - maximum square dimensions shown. create a watertight seal against the underside of the mechanism 47.64 The floor that immediately covers the mechanism should be AI AI 1210 enclosure. easily removable to allow access for installation and 1.97 max. maintenance. 50 max. 7.28 max. 10.00 max. Flap/ Surrounding 185 max. A minimum 45mm [1.8"] soakaway area beneath the 254 max. Floor Thickness Flap mechanism should be allowed to ensure the mechanism is no Flap Length submerged in any excess water that may accumulate in the Width floor pit. C C B 23.62 600 Flap Panel will create a |PLAN VIEW| B Removable Floor watertight seal against Disc the underside of the mechanism enclosure when closed. 50.00 1270 Speaker 70.87 1800 Height Internal Height A A 1.77 45 Soakaway Area B SECTION B-B - CLOSED SECTION B-B - OPEN SECTION A-A TECHNICAL SHEET UK +44 (0) 1438 833577 US +1 (603) 742 9181 ISSUE 002 WWW NET . . SHEET 2 FUTUREAUTOMATION

Page 3

OSL 88 OUTDOOR SPEAKER LIFT GROUND PREPARATION + FRAME INSTALLATION The modular design of this mechanism allows a flexible installation where space can be |STAGE 2| allocated in the ground during the early stages of construction using the Primary Frame. The speaker and flap panels can then be added at a later date. Position the Primary Frame so that the top face of the frame sits 5mm [0.2”] below the underside of the |STAGE 1| finished floor. The floor pit must be excavated to the minimum dimensions shown below. The NOTE: It is critical that the Primary Frame is Finished speaker will rise out of the center of the mechanism therefore the center of the positioned perfectly level and square as the lift Floor 0.2 min. speaker will be aligned with the center of floor pit. elements of the mechanism will be positioned Thickness 5 min. relative to the frame. Cables should enter the FRONT of the floor pit, 55mm [2.2”] below the underside of the finished floor. Once the position of the frame has been set, the floor pit can be back filled if desired - as a minimum A layer of gravel should be placed at the base of the pit to allow for water to requirement the frame should be packed out to the drain away. This layer should be minimum 45mm [1.8”] deep leaving 1755mm pit wall to aid stability when the speaker is revealed. [69.1”] of height between the gravel and the underside of the finished floor material. NOTE: If back filling with concrete, the concrete mix should be kept as dry as possible to minimize the 2.0 max. 50 max. chance of it flowing into the gravel layer and blocking Finished the soak-away. Floor 24.0 min. The concrete should only be filled up to the ‘FILL Thickness Cable Conduit 609.6 min. LINE’ marker on each side of the frame. D 2.2 55 E E 70.9 min. 69.1 1800 min. 1755 Internal Pit Depth Supplied Installation Brackets 19.9 1.8 (Cross beams not supplied) 505 45 Fill Line D Gravel Layer |SECTION D-D| TECHNICAL SHEET UK +44 (0) 1438 833577 US +1 (603) 742 9181 ISSUE 002 WWW NET . . SHEET 3 FUTUREAUTOMATION

Page 4

OSL 88 OUTDOOR SPEAKER LIFT MECHANISM INSTALLATION |STAGE 4| |STAGE 3| To finish the installation of the mechanism the Flap Drive unit must be fixed to Once the Primary Frame position has been set the Lift Mechanism can be the top face of the Primary Frame. The speaker can be fixed into position above lowered onto hook pins located at the base. Securing bolts at the top of the Lift ground level so can be added at a later time if necessary. Mechanism are then used to fix the unit to the Primary Frame. TECHNICAL SHEET UK +44 (0) 1438 833577 US +1 (603) 742 9181 ISSUE 002 WWW NET . . SHEET 4 FUTUREAUTOMATION