This document could not be shown here. Open the PDF.
Text of this document13 pages · 1,132 words
Page 1
SB-L100-UF-ADJ LUTRON100 COMPATIBLE ADJUSTABLE SHADE BRACKET KIT INSTALLATION INSTRUCTIONS ISSUE 001
Page 3
SB-L100-UF-ADJ PACKAGE CONTENTS SB-L100-UF-ADJ Brackets are supplied as a pair, each pair consisting of the below; 1 - Shade Mounting Bracket (Left) 1.1 - Sub Bracket (Left) 1.2 - Mount Plate (Left) 2 - Shade Mounting Bracket (Right) 2.1 - Sub Bracket (Right) 2.2 - Mount Plate (Right) 3 - Accessories Kit (Not Shown) 3.1 - Qty 4 - Plastic Guide Bush 3.2 - Qty 2 - M5 x 6mm Pozi Thread Forming Bolt 3.3 - Qty 2 - M4 x 10mm Countersunk Machine Bolt 3.4 - Qty 2 - No.10 x 5/8th Countersunk Self Tapping Bolt Required, But Not Supplied; - Lutron two-part idler adjuster bracket assembly (Supplied with Lutron shades) 1.1 2.1 1.2 2.2 3
Page 4
SB-L100-UF-ADJ MOTOR END BRACKET FIXING 1 Take required Mount Plate (Left or Right) that you wish to mount to the motor end of the Lutron100 shade. 2 Attach the Mount Plate to the end of the Lutron100 motor as shown below, using two of the supplied Plastic Guide Bushes and two of the supplied No.10 x 5/8th Countersunk Self Tapping Bolts. The fixings holes in the Mount Plate will line up with the fixing holes in the end of the Lutron100 motor. 3 Ensure that the Mount Plate is fitted so that the small folded tab on it is on the same side of the motor as the motor control buttons, and that the Plastic Guide Bushes are fitted the correct way round, as shown below. 4
Page 5
SB-L100-UF-ADJ IDLER END BRACKET FIXING 1 Take required Mount Plate (Left or Right) that you wish to mount to the idler end of the Lutron100 shade. 2 Attach the Mount Plate to the end of the Lutron100 idler as shown below, using two of the supplied Plastic Guide Bushes and two of the supplied M4 x 10mm Countersunk Machine Bolts. The fixings holes in the Mount Plate will line up with the fixing holes in the two-part idler adjuster bracket assembly that comes pre-fitted to the Lutron100 Idler. 3 Ensure that the Mount Plate is fitted so that the small folded tab on it is on the same side of the idler as the idler adjust bolt, and that the Plastic Guide Bushes are fitted the correct way round and that the adjuster bolt is acessible from below, as shown. 5
Page 6
SB-L100-UF-ADJ SUB BRACKET INSTALLATION 1 Take the two Sub Brackets and make sure that you are fitting them in the correct place to interface with the matching left or right Mount Plates already fitted to the Motor and Idler ends of the shade. 2 Fit the left and right Sub Bracket in place using the methods below, depending on the desired fixing type. Measure the end to end length of the shade, including the fitted Mount Plates to get the correct spacing for the inside faces of the Sub Brackets. 2A Future Automation UniChannel Fixing; SB-L100-UF-ADJ Sub Brackets are designed to easily twist in to the Bracket Mount Rail in Future Automation’s UniChannel recessed shade pocket system. Simply offer each Sub Bracket up to the Bracket Mount Rail in the top face of the UniChannel at a slight angle and then twist the bracket counter clockwise to lock into place. Each Sub Bracket can be repositioned by twisting it clockwise to unlock, then sliding it along the Bracket Mount Rail to the desired position before twisting back to lock into place. For additional security, the Sub Brackets can be secured into the Bracket Mount Rail by tightening the pre-installed grub/set screws or by putting suitable fixings (not supplied) through the slots in the top return on the bracket into the aluminium of the Bracket Mount Rail. 6
Page 7
SB-L100-UF-ADJ SUB BRACKET INSTALLATION (CONT.) 2B Ceiling/Top Fixing; SB-L100-UF-ADJ Sub Brackets feature a folded top return with fixing slots to allow the brackets to be secured upwards into a suitable fixing substrate above. Simply put two suitable fixings (not supplied) upwards through these slots to secure each Sub Bracket in place. The fixings can be loosened and each Sub Bracket position adjusted slightly forwards or back using the slots, if their position needs to be fine tuned. 7
Page 8
SB-L100-UF-ADJ SUB BRACKET INSTALLATION (CONT.) 2C Wall/Face Fixing; SB-L100-UF-ADJ Sub Brackets feature a folded side return with fixing slots to allow the brackets to be secured outwards into a suitable fixing substrate behind. Simply put two suitable fixings (not supplied) outwards through these slots to secure each Sub Bracket in place. The fixings can be loosened and each Sub Bracket position adjusted slightly left or right using the slots, if their position needs to be fine tuned. 8
Page 9
SB-L100-UF-ADJ SHADE INSTALLATION 1 Once the Mount Brackets are installed onto the Lutron100 Motor and Idler, and the Sub Brackets are in position in the desired mounting location, the shade and Mount Brackets can be lifted directly upwards to engage into the Sub Brackets from below. 2 Each Sub Bracket has two large open slots that the Plastic Guide Bushes on the Mount Bracket will locate into while the shade is being lifted up into the Sub Brackets. 9
Page 10
SB-L100-UF-ADJ SHADE INSTALLATION (CONT.) 3 When the Mount Bracket is lifted high enough up into the Sub Bracket, it will ‘click’ into place using a pair of set screws that are pre-installed in the Mount Bracket. These set screws will temporarily hold the shade in place until a securing bolt is installed. 4 Once the Mount Bracket has engaged onto these set screws, one of the supplied M5 x 6mm Pozi Thread Forming Bolts can be installed into the folded return on the bottom of each of the Mount Brackets to lock it securely to the Sub Bracket. 5 Ensure that the M5 x 6mm Pozi Thread Forming Bolts are secured into the brackets on both the motor and idler ends of the shade. 10
Page 11
SB-L100-UF-ADJ SHADE LEVELING 1 Once the shade is fitted and locked into place with the securing bolts, each bracket can be adjusted up or down from below as required to level the shade. 2 The long pre-installed Adjuster Bolt on each bracket (accessed from below) can be rotated clockwise to raise that end of the shade. 3 Or counter-clockwise to lower that end of the shade. The brackets offer up to 13.5mm (9/16”) total adjustment on both ends of the shade. 11
Page 12
NOTES:
Page 13
EUROPEAN OFFICE NORTH AMERICAN OFFICE Address: Address: Unit 6-8 Enterprise Park Brunel Road 127 Venture Drive Bedford Dover Bedfordshire NH MK41 9TG 03820 Phone: +44 (0) 1438 833577 Phone: +1 (603) 742 9181 Email: info@futureautomation.co.uk Email: info@futureautomation.net OfÏce Hours: OfÏce Hours: Mon - Fri 8:00 to 17:30 GMT Mon - Fri 7:00 to 17:00 EST Saturday & Sunday - Closed Saturday & Sunday - Closed www.FUTUREAUTOMATION.net
Need assistance or looking to source this item?