PL TV LIFT INTEGRATION CONSIDERATIONS General Mitigations: - Activate hold-to-run (dead-man-switch) operation. - Locate controls within direct line of sight of the mechanism. HIGH RISK - CRUSH HAZARD - Implement password-protected or key-switch-protected Crush hazard between the base operation. panel and underside of cabinet top as the lift opens. MITIGATION HIGH RISK - CRUSH HAZARD Crush hazard above the Ensure the cabinet top is floating mechanism when the and not permanently fixed, mechanism is lifting. allowing vertical movement if obstructed. MITIGATION Ensure the area above the HIGH RISK - CRUSH HAZARD mechanism is clear of any Crush hazard between the base potential hazards. panel and underside of cabinet top as the lift closes. MITIGATION Tape switch to underside of cabinet top. LOW RISK - CABLE SNAGGING HAZARD Cables may become snagged if not correctly managed through or around the mechanism, potentially causing damage to the mechanism or electronics. Tape switch integration. MITIGATION Allow sufÏcient cable slack around all movable joints to prevent stretching or damaging the cables or mechanism. Run all loose cables For more information on Hold-to-run and tape switch integration follow inside suitable trunking / conduit. link or scan the QR below https:// fa.support/Files/PL The installer is responsible for conducting a site-specific risk assessment. Due to the unique conditions of each installation, Future UK +44 (0) 1438 833577 US +1 (603) 742 9181 Automation cannot provide an exhaustive list of all potential risks. Installers must ensure that all risks associated with installation, operation, and maintenance are identified and mitigated in accordance with applicable legislation and best practice. www.FUTUREAUTOMATION.net Further safety and servicing guidance is available at: www.futureautomation.net/safety
Need assistance or looking to source this item?